Examples of Projects
Water Supply in the Lechfeld Area
High water losses and hydraulic problems led to the design and execution of ample rehabilitation measures based on a hydrodynamic calculation of the complete network. 20 km of new pipes have been laid and 15 km of house connecters have been rebuilt.

Due to a landscape drop of 40 m2 communities needed a water pressure reduction system.

The existing water source was contaminated with nitrates and pesticides, so that new resources in a depth of 200 m had to be made accessible. After the removal of iron and manganese the water is stored in earth-covered concrete basins with a volume of 4.000 m3.

The waterworks themselves consist of a management building with control centre, social rooms, water treatment, workshop and storage area. In case of power failure the pressure pumps for the supply network can be backed up by a emergency power plant within 45 seconds.
  • peak water consumption 200 l/s
  • network of 6 communities and a military barrack unit
  • 2 deep wells and appendant waterworks
  • pipe network rehabilitation with 120 km length
  • water treatment plant
  • project management and construction supervision
Motorway Modernisation
We are the leaders for design and planning acceptance in the 6 lane widening on the motorway A8 between the Zusmarshausen and Adelsried Junctions.
More>
Jubilee
To celebrate the 10th Jubilee of the Saale-Rippachtal Sewage Cooperative Steinbacher-CONSULT donated a tree as a goodwill-gesture.
More>
GIS for Morocco
Conditions for the introduction of a GIS in Morocco were explored under the framework of financial cooperation between the Federal Republic of Germany and Morocco.
More >