Water Supply in the Lechfeld Area
High water losses and hydraulic problems led to the design and execution of ample rehabilitation measures based on a hydrodynamic calculation of the complete network. 20 km of new pipes have been laid and 15 km of house connecters have been rebuilt.
Due to a landscape drop of 40 m2 communities needed a water pressure reduction system.
The existing water source was contaminated with nitrates and pesticides, so that new resources in a depth of 200 m had to be made accessible. After the removal of iron and manganese the water is stored in earth-covered concrete basins with a volume of 4.000 m3.
The waterworks themselves consist of a management building with control centre, social rooms, water treatment, workshop and storage area. In case of power failure the pressure pumps for the supply network can be backed up by a emergency power plant within 45 seconds.
|
< back to overview |
|
 |
 |
 |
 |
- peak water consumption 200 l/s
- network of 6 communities and a military barrack unit
- 2 deep wells and appendant waterworks
- pipe network rehabilitation with 120 km length
- water treatment plant
- project management and construction supervision
|
|