Examples of Projects
Bypass for the City of Neusäß
The city of Neusäß awarded Steinbacher-CONSULT with the design, project control and construction management of their bypass road. The 24mio€-budget-project was realised between the urban areas of Neusäß and Augsburg.

Problem was to set up project control in the already well advanced design stadium. An overall execution plan with detailed intermediate deadlines coordinated 11 construction phases to keep the scheduled completion date.

Even during construction many alterations were made due to various reasons. Nevertheless the project was accomplished in time by continuous adaptations and reorganisations.
  • 3,1 km long with 2 crossings
  • 1 roundabout with 40 m in diameter and with 2 bypasses
  • 3 bridges
  • 1 double-lane tunnel with 430 m length
  • 1 noise protection wall 1.500 m long
Motorway Modernisation
We are the leaders for design and planning acceptance in the 6 lane widening on the motorway A8 between the Zusmarshausen and Adelsried Junctions.
More>
Jubilee
To celebrate the 10th Jubilee of the Saale-Rippachtal Sewage Cooperative Steinbacher-CONSULT donated a tree as a goodwill-gesture.
More>
GIS for Morocco
Conditions for the introduction of a GIS in Morocco were explored under the framework of financial cooperation between the Federal Republic of Germany and Morocco.
More >